ODM is our primary model: one-stop customisation from design and development to manufacturing, so a distributor or utility brand can reach the market without building a metering R&D team.
Developing a meter means tooling, electronics, firmware, calibration and certification — a two-year programme before the first invoice. Starting from a proven platform removes most of it, and keeps the parts that actually differentiate you: your housing, your dial, your protocol, your brand.

Everything below is set at order and locked in the production file. Anything outside this list is quoted as a development item, with the tooling cost stated separately.
Minimum order quantity, tooling cost and lead time depend on the configuration and are confirmed in the quotation — we do not publish a single number that would be wrong for most projects.
Market, DN mix, protocol, certification target and volume.
Design-for-manufacture on the housing and electronics; deviations flagged in writing.
Mould design and cut in-house, first-off samples for fit and appearance.
Protocol implementation and test against your head-end or a simulator.
Small batch through calibration and the CNAS laboratory; reports issued.
100% calibration, serialisation, sealing and export packing.
Not every partner needs a custom meter. Distribution gives you open access to the existing range — XY, LXSY, LXCY and the DN80 — with protocol documentation, a bench unit for your evaluation and technical answers from the people who built it.

Dial artwork, the register layout, the nameplate, the cover marking and the export carton. The metrological body stays as approved, because any change inside the measuring path means new type testing.
Yes. Telegram structure, register map, reporting interval and Modbus or M-Bus mapping are set at order, and the firmware is tested against your head-end or a simulator before the pilot batch.
NB-IoT, LoRaWAN, 4G Cat.1 and Wi-SUN, on the same meter platform, so the housing and the measuring path do not change when the uplink does.
Test reports from our laboratory, ISO 4064 test reports, and technical file support for your local approval. The platform carries CE verification under the EMC Directive; approval in your market remains your notified body's decision.
By whether the configuration runs on an existing tool or needs a new mould, and by the DN mix. Both are confirmed in the quotation rather than published as one number that would be wrong for most projects.
A brief with the market, the DN mix, the network, the certification target and the annual volume. The answer states what can stay standard, what needs tooling, and what it costs, before you commit to a programme.
Tell us the market, the DN mix, the network and the annual volume. We come back with what can be standard, what needs tooling, and what it costs — before you commit to a programme.
Interface translated. Technical documents stay in English.